In these videos you can watch how to assemble and pre-drill the shutter frames for the 3 designs, if your side fixing watch the additional side fix video.

TIP: This blog post explains how the shutters and panels are labelled

Find 4 videos on:

    1. Full height (Typical)
    2. Tposts (Includes vertical Tposts)
    3. Tier on tier (Includes horizontal Tposts)
    4. Side fixing (Where to drill pilot holes)

 

1. Full height

2. Tposts

 

 

3. Tier on tier

4. Side fixing